Color Wrap Film for car body wrapping have gloss,matte, metallic,chrome, chameleon,diamond,holographic,brushed finish and all car color wraps with imported Ishland glue and diamond air channels with good stretchable,very good to install and last long time outside over 3-5 years.
1.Water Resistant and UV Protected.
1. Clean off any dust, dirt or wax or other things before installation.
2. Measure the amount of protective film needed for the part to be fixed.
3. There is a transparent protective film on the surface which must be peeled off before use.
4. With a hair dryer, let the film be flexible and reduce wrinkles.
5. Even though it is waterproof, it cannot be completely submerged in water.
6. After assembly, please leave the car under the sun within 48 hours or do not wash the car in the meantime. Do not let the car stickers touch the water after installation for 48 hours.
Matte Car Wrap,Car Wrap Film,Car Wrapping Film,Gloss Car Wrapping,Car Wrapping Vinyl Guangzhou Fuyulai Technology Co.,Ltd , https://www.fuyulaifilm.com
2.Invisible Air-Release Channel, easily get rid of bubbles during installation.
3.Strong self adhesive, eliminate bubbles, peel and stick application.
4.Gloss and smooth finish.
5.Stretchable with heat.
6.Easy to clean with soap and water.
7.Long lasting for approximately 5 years indoor use and 3 years outdoor use.
8.It can also be applied onto most smooth painted or metalized surface such as cell phone, laptop, home appliances, table and even cabinet and much more.
Installation Tips
·Sifang contracted to build a car lightweight aluminum alloy low-pressure casting center
Recently, Dongfeng Company's automobile lightweight aluminum alloy low-pressure casting research center cooperated in the signing ceremony of the four parties, and was held in the general casting and forging factory of Dongfeng Motor Dongfeng Motor Co., Ltd. in Shiyan, Hubei. The aim is to provide lightweight solutions for new energy, powertrains and body parts through industry, university and research, and to meet the needs of customers for simultaneous development and lightweight "product shelf" development.
Four units of Dongfeng Motor Corporation General Casting and Forging Plant, Hubei Automotive Industry Institute, Shenyang Foundry Research Institute and Guangdong Fenghua Zhuoli Technology Co., Ltd. signed a strategic cooperation framework agreement for enterprises and universities. Sifang will use its respective advantages to establish a comprehensive cooperative relationship between industry, academia and research, and jointly build a research center for automotive lightweight aluminum alloy low-pressure casting, jointly developing aluminum alloy materials for automobiles, lightweight design of aluminum alloy castings, and development and application of aluminum alloy casting technology. All aspects of cooperation.
The Low Pressure Foundry Research Center is committed to providing aluminum alloy lightweight solutions that will have four core competencies: “advanced development capabilityâ€, “advanced manufacturing technologyâ€, “lean manufacturing capability†and “efficient service capabilityâ€, as well as “establishing automotive lightnessâ€. Quantitative technology shelves, "providing differentiated solutions", "building standardized, specialized, information-based, intelligent manufacturing systems", "forming aluminum alloy parts with key technologies and core technologies" and other six functions.
According to reports, the foundry center mainly develops non-ferrous low-pressure casting business, builds the core capacity of aluminum alloy low-pressure casting products for full value chain development, strengthens the research and development of new automotive materials, new processes and new technologies, promotes the transformation of scientific research results and productivity, and jointly promotes automobiles. Lightweight technology manufacturing level. At the same time, it will enhance the research and development capabilities of Dongfeng Motor Corporation's general casting and forging plant and the industrial application capability of lightweight low-pressure casting.
It is understood that in January 2016, General Casting and Forging Plant set up a shell workshop in Dongfeng Equipment Industrial Park. Under the drive of the U401 gearbox housing project, the shell casting and machine plus full-process production capacity was initially established, forming Dongfeng Motor Corporation. The prototype of the low-pressure casting center. In the future, we will fully build digital intelligent manufacturing demonstration lines, including production automation, industrial robots (including logistics robots), intelligent digital measurement and acquisition, intelligent identification, intelligent logistics, and information integration.