Mining steps and tertiary reserves Relationship between secondary and tertiary reserves and mining steps According to the preparation degree of mining, the ore reserves can be divided into three levels, namely, exploiting reserves, mining reserves and reserve reserves. These three reserves are called tertiary reserves. (1) Exploiting reserves Through the tunneling and opening of the roadway, a certain transportation, ventilation and drainage system has been formed. The deposits in the area controlled by these development roadways are called exploiting mines. (2) Acquisition of reserves It is part of the exploitation of minerals. Where the mining area or the mining wall, the amount of mining work specified in the mining method is completed, and the reserves in these mining areas or mine walls are called mining reserves. (3) Reserves It is part of the acquisition reserve. The reserves of the cutting engineering quantity specified in the mining method in the mining area or the mining wall are called reserve reserves. In the three steps of mining above, in the initial stage of mining, each mining step is carried out in sequence, that is, the required three-level reserves can be put into production according to the infrastructure schedule; in the normal production period (ie, after the production), the implementation should be implemented. The principle of "excavating and cultivating first." Generally, it is necessary to ensure the indicators of the three-level reserves, otherwise there will be mining disorders, which will cause the mining production to be in a chaotic and passive situation. Therefore, we must always pay attention to properly arrange the development, mining, and recovery work. It is necessary to follow the principle of pioneering the advance and adopting the advanced mining. Only in this way can the production of the mine be sustained, stable and balanced. This is because development, precision and cutting reflect the level of readiness for mining. The advanced relationship between the above three steps, the degree of preparation is usually expressed by the mining time required for the three-level ore provided by the tunneling, mining, and mining roadway. In general, mines should have more than three years of mining capacity, about one year of mining and mining, and about six months of preparation. Color Coated Coil,Color Coated Steel Coil,Dipped Color Coated Steel Coil,White Color Coated Coil Shandong Panhua Metal Material Co. LTD , https://www.cnyzsteel.com